Over the years we've completed various work throughout Malaysia. The following is simply a short list of work we've done before. For more details on our works, please do not hesitate to contact us.
Kejuruteraan Bintai Kindenko Sdn. Bhd.
2x700MW Coal Fired Power Plant, Jimah Package 2 - Testing & Commissioning of Electrical Equipment & Material Installation Works
500kV Jimah Switchyard - Engage full time Coordinator Engineer
500kV Jimah Switchyard - To provide Supervision during Cable Laying
1) Tg.Bin 3x700MW Coal - Fired Power Plant Manpower Supply for Testing & Commissioning
2) Tg.Bin 3x700MW Coal - Fired Power Plant 500/275kV Tg.Bin Power Station (Bukit Batu)
3) Tg.Bin 3x700MW Coal - Fired Power Plant 500/275kV Tg.Bin Power Station Retesting of Over Current Relays
4) Tg.Bin 3x700MW Coal - Fired Power Plant Manpower Supply for Generation Performance Test
5) Tg.Bin 3x700MW Coal - Fired Power Plant Transformer Oil Test
6) Tg.Bin 3x700MW Coal - Fired Power Plant Manpower Supply for Testing & Commissioning
1) Supply of Manpower for Commissioning with Equipment
System Protection & Maintenance Sdn Bhd
1) Testing & Commissioning 500/275kV 1 1/2 Breaker Bukit Batu Substation
1) Maran 132kV substation & Kg. Awah Substation
1) Testing & Commissioning Works Kapar 275kV Substation
1) Testing & Commisioning Works at Kolopis Substation
Persada Electrical & Engineering Works Sdn. Bhd.
1) Testing & Commisioning Works at Rawang, Sungkai & Kalumpang 132kV Substation
V3 - NEIE Engineering Sdn. Bhd.
1) Transformer Oil Filling and Filteration works for Tg.Bin Power Plant, Pontian
2) Testing & Commissioning of Switchgear, Transformer and Auxillaries for Tg.Bin Power Plant
3) Cable Testing, Cable Termination, Straight thro joint and LT Straight thro Joints for Tg.Bin Power Plant
Testing & Commissioning of 60MVAR 132kV shunt at Permas Jaya, Cahaya Baru, Batu Pahat East, Gelang Patah & Skudai Substation
S.M. Muhibbah Heavy Engineering & Construction (M) Sdn. Bhd.
1) Testing & Commissioning works Inclusive of PTW, SCA, SAT & PIAT Requirements
2) Testing & Commissioning of 132/11kV Switchgears Metacorp Substation
3) Supply & Installation of 33kV Power Cable for Re-Routing and Re-Sitting Works - PMU NKST North Port Klang
4) Tg.Gelang & Bukit Indera Mahkota Substation
1) Pandamaran Substation 275/132/33/11kV
2) Testing & Commissioning Works at Ulu Yam Substation
1) Supply, Erect & Commissioning of 132kV Switchgears and Ancillary Equipment and Associated Civil Works for the Extension of Kuala Lipis 132kV Substation
2) Supply & Erection of 132kV Switchgears, Ancillary Equipment and Associated Civil Works for Extension Works Existing TNB's Transmission - Kota Star 275/132/33/11kV
3) Supply & Erection of 132kV Switchgears, Ancillary Equipment and Associated Civil Works for Extension Works Existing TNB Transmission Substation - Mergong 132/33/11kV
4) Supply, Erect & Commissioning of 132kV & 33kV Switchgears, Ancillary Equipment and Associated Civil Works at Kuala Lipis 132/33/11kV Substation (Supply To Meico Chipboard)
5) Supply, Erect & Commissioning of 132kV Switchgears and Ancillary Equipment and Associated Civil Works for Extension of Kuala Lipis 132kV Substation
6) Supply and Erect of 132kV, 33kV, 11kV Switchgears, Ancillary Equipment and Associated Civil Works for Extension works in Existing TNB's Transmission Substation (Renggam)
7) Supply & Erect of 132kV Switchgears, Ancillary Equipment and Associated Civil Works for Extension works in Existing TNB's Transmission Substation PMU Kuala Lipis
8) Supply & Erect of 132kV, 33kV, 11kV Switchgears, Ancillary Equipment and Associated Civil Works for Extension Works in Existing TNB's Transmission Substation - Kuala Lipis - Mainhead B
9) Supply & Erection of 132kV, 33kV, 11kV Switchgears, Ancillary Equipment and Associated Civil Works for Extension Civil Works in Existing TNB's Transmission Substation. (Mainhead A & B)
10) Supply, Installation, Testing & Commissioning of Remote Terminal Units for TNBD Perak RCC Telecontrol System
11) Kerja-kerja membersih panel-panel kawalan & perlindungan 275/132lV, RTCC alat perakam gangguan perlindungan 275/132kV di PMU Jalan Pantai
12) Kerja-kerja merentang kabel multicore, pendawaian & pengujian di Skudai Rehad 132kV
13)Supply, Installation Testing & Commissioning for Remote Terminal Units for TNBD Perak RCC Telecontrol System
- Certificate of Appreciation: ALSTOM Power Asia Pacific Sdn Bhd - Jimah 2x700MW Coal Fired Power Plant For valued contribution towards the achievement of 500,000 man hours without Lost Time Injury (LTI)
- Certification of Appreciation for PD2 Rehabilitation Project
- For contribution in achieving 5,000,000 manhours without LTI on 9th July 2008 at Tuanku Jaafar Power Station, Port Dickson Rehabilitation Project Phase 2
- Certificate of Appreciation: Tanjung Bin Power 5 Million manhours without LTI on 28 June 2006 at 3x700MW Coal Fired Power Plant Tanjung Bin, Johor
- Certificate of Appreciation: TOS Energy Malaysia Sdn Bhd
- For contribution towards te achievement of 3,000,000 Man-hours work without LTI Recorded on 29 May 2006